Checking tiling at handover

What to inspect and keep when tiling is finished at a Pakenham 3810 home.

Checking tiling at handover

Illustrative image, not a completed customer project.

The end of a tiling job is the best time to raise anything that is not right, while the tiler is still on site and the materials are at hand. A short, calm walk-through with good light, plus a folder of the right documents, saves arguments later. This guide sets out what to look at and what to keep.

It applies to bathrooms, laundries, kitchens, floors and outdoor areas. It is general guidance, not a building inspection. If you need a formal inspection, engage a qualified building inspector. For new tiling work, send a tiling enquiry and up to three independent local businesses can respond.

Before the walk-through

Pick a time with the tiler when you can both look at the work properly. Natural daylight and a torch help, because low-angle light shows uneven edges and grout gaps that overhead lights hide.

Have these at hand:

  • The accepted quote and any written variations.
  • The agreed layout, sketch or marked plan.
  • Tile and grout selections.
  • Any photos taken during the job.

Walk through each area in turn and note anything you want to discuss. Keep the tone practical. A tiler is usually happy to fix a missed grout joint or a smear before leaving.

What should you look at on floors?

Check What to look for
Layout Pattern matches what was agreed; cuts in the agreed places
Lippage Edges of neighbouring tiles sitting at noticeably different heights
Hollow tiles Tap gently with a coin or knuckle; listen for a hollow sound
Grout Joints full, consistent width and colour, no gaps or pinholes
Movement joints Flexible sealant at walls and where required, not grout
Falls In wet areas, water runs to the waste and does not pool
Edges Trims and junctions with other floors finished neatly
Cleanliness No adhesive or grout haze left on tile surfaces

Some variation is normal, especially with handmade or natural tiles and tiles with slight bow. Ask the tiler to explain anything you are unsure about, and whether it falls within the tile manufacturer’s tolerances.

How do you check the falls in a shower?

With the tiler’s agreement, run water or pour a small amount on the shower floor and watch where it goes. It should move toward the waste without sitting in puddles. A small film of water is common, but pooling in corners or away from the waste deserves a question. Do not flood the room. If the waterproofing has only recently been completed, check with the tiler when water can be used.

Walls

On walls, check:

  1. Tiles are straight and level, and grout lines run true.
  2. Cuts around windows, niches and fittings are neat.
  3. Edges and external corners have the agreed trim or finish.
  4. Feature tiles and niches are where you agreed.
  5. Sealant joints at internal corners and around baths and shower bases are complete.

Look along each wall from the side with a torch to spot tiles that stick out.

Wet areas

In bathrooms and laundries, the handover is also when you collect the waterproofing records. Waterproofing of domestic wet areas is covered by AS 3740 and Victorian building requirements, and the work is hidden under the tiles. Ask for:

  • The waterproofing product and system used.
  • The areas treated.
  • The date of application and any test results.
  • The business or practitioner who did it, with contact details.

Our wet area waterproofing page explains why this information matters. If plumbing or electrical work was part of the job, ask each trade for its compliance certificate where one applies.

Kitchens and splashbacks

For splashbacks, look at how tiles meet the benchtop, the rangehood, window reveals and power points. Power point covers should sit flat against the tiles. Sealant should be used at the joint with the benchtop rather than grout. Our kitchen splashback page covers these details.

Outdoor areas

Outside, check that water drains off the tiled surface and away from the house, and that movement joints are in place. Look at edges, steps and junctions with paving or lawn. Outdoor tiles can look different when wet, so look at them after rain or a hose if practical. Our outdoor tiling page has more on outdoor work.

Cleaning off grout haze

A thin haze of grout residue can be left on tiles after the job. Ask whether the final clean is included and what product should be used to remove any remaining haze. Some cleaners damage certain tiles or grouts, especially natural stone and some coloured grouts. Use only what the tiler or manufacturer recommends.

What should you keep?

Put these in one folder or digital folder:

Item Why keep it
Accepted quote and variations Shows what was agreed
Invoice and payment records Proof of work and date
Tile range, size and batch numbers Needed for matching repairs
Spare tiles Matching later is often impossible
Grout and sealant names and colours Needed for repairs and regrouting
Waterproofing records Hidden work; needed if a leak occurs
Compliance certificates For plumbing and electrical work
Care instructions Correct cleaning protects tiles and grout
Business contact details For warranty questions

Store spare tiles somewhere dry, with the box label.

Before final payment

Final payment is usually the point at which the job is treated as complete. Before paying, make sure:

  1. Every item on the quote has been done.
  2. Agreed variations are complete.
  3. Any defects found in the walk-through are fixed or have a written date for fixing.
  4. You have received the records you asked for.
  5. The site is clean and waste removed.

If something is still outstanding, agree in writing what it is and when it will be done. Pay the amount due under your agreement, but keep a clear record of anything still open.

Using the room for the first time

The first few uses of a new bathroom or laundry are a good test. Watch the shower floor drain, look for water escaping past the screen or door, and check the base of walls outside the shower over the first weeks. Small issues, such as a missed sealant joint, are easier to fix early. Tell the business promptly if something looks wrong.

Shower screens and fixtures

Shower screens are often fitted after tiling by another business. When the screen goes in, check that it is sealed to the tiles where the installer says it should be, that the door closes without catching, and that water stays inside the shower when it is used. Check that fixtures fitted through the tiles, such as towel rails and toilet roll holders, are firm and sealed. If anything was drilled after tiling, ask how the holes were sealed.

Photos for your records

Before the tiles cover everything, photos of each stage are valuable. If you can, take photos of:

  • The framing and pipe positions before sheeting.
  • The sheeting and preparation.
  • The waterproofing after completion.
  • The finished tiling.

If a leak happens years later, these photos show where pipes run and what was done. Ask the businesses if they take progress photos and whether they can share them.

Regular checks after handover

A quick look every few months helps catch small problems early. Check silicone joints for gaps or mould, grout in the shower for cracks, and the base of walls outside wet areas for stains. Tap floor tiles in high-traffic areas now and then to see if any sound hollow. Fixing a split sealant joint early is much cheaper than repairing water damage later.

Selling the home later

Buyers and their inspectors often ask about bathroom renovations. A folder with the quote, invoices, waterproofing records and compliance certificates helps answer those questions. Keep it with the property documents.

Raising a problem

If you find something that needs fixing, tell the tiler before final payment if possible. Describe it clearly, take photos and agree in writing what will be done and when. Many issues are small and fixed on the spot.

If a problem appears later, such as a cracked tile or a leak, contact the business that did the work with photos and a description. Do not try to fix it yourself first, as that can make the cause harder to work out. Our tile failure guide explains how to record what you see.

If you cannot resolve a dispute, the Building and Plumbing Commission and Domestic Building Dispute Resolution Victoria have information on domestic building disputes, and Consumer Affairs Victoria has information on consumer rights.

Caring for new tiles and grout

New grout and sealant need time to cure before heavy use and cleaning. Ask the tiler when the shower can be used and when floors can be mopped. Use the cleaning products recommended for your tiles and grout. Ventilate wet areas with the exhaust fan and open windows to reduce mould on grout and sealant.

Sealant joints are maintenance items and may need replacing over the years. Natural stone may need resealing. Our tile repairs page covers regrouting and resealing.

Sending your enquiry